Maintenance & repair · AS9110

MRO quality systems built around the maintenance operation.

Connect maintenance planning, competent people, technical records and release controls into a system your team can run and demonstrate.

Start with a free 15-minute discussion. Scope and fees follow an assessment.

Problems We Fix

What usually goes wrong.

Customer Audit Risk

Airline and lessor audits keep finding the same things

Your regulator may be satisfied, but customer audits are not. This gap is almost always found in records, sub-tier control, or human factors, rather than in the actual maintenance work itself.

Records Risk

Technical records that don't survive scrutiny

The work itself was done correctly, but retrieval is slow, amendment status is unclear, or the record simply cannot prove what the auditor is asking about.

Competence Risk

Certifying staff authorisations drift

Scope of authorisation, continuation training, and competence evidence gradually fall out of step with who is actually signing the releases.

Supply Chain Risk

Subcontracted maintenance you can't fully evidence

Work that is sent outside is approved only informally, or the evidence that comes back does not match what Clause 8.4 actually expects you to hold.

Human Factors Risk

Repeat error findings

Shift handover, fatigue, and workload keep producing the same category of finding, across different auditors. This is a structural problem, not a training problem.

Transition Risk

Moving to AS9110 from ISO 9001 or AS9100

You already have a system in place, but it was built for a different activity altogether. Carrying it across without a proper gap map is exactly how organisations end up arriving at audit unprepared.

Requirement Breakdown

What AS9110 asks for that AS9100 does not.

Seven areas account for most of the gap when a maintenance organisation is measured against AS9110C rather than against a manufacturing standard.

Maintenance process control

Work orders, task cards, and the release chain: evidence that the maintenance actually performed matches what was authorised, and that the record clearly reflects this.

Human factors & maintenance error

Fatigue, shift handover, and error capture. Findings in this area are common, and are rarely closed simply by writing another procedure - rather, the actual working pattern needs to be examined.

Technical records & maintenance data

Control of the data you work to, and the records you hand back to the customer: amendment status, retention, legibility, and traceability under audit.

Tooling, calibration & shelf life

Tool and equipment control, calibration recall, and shelf-life-limited materials, all managed within a live hangar environment rather than simply on a spreadsheet.

Certifying staff competence

Qualification, authorisation scope, and continuation training for the people who actually sign the release - with evidence of real competence, rather than just attendance.

Safety management

Alignment with International Civil Aviation Organization (ICAO) Annex 19 safety-management expectations, along with whatever your regulator specifically requires of your Safety Management System (SMS).

Contracted maintenance & sub-tier control

Clause 8.4 applied to subcontracted tasks: who you are sending work to, how they were approved in the first place, and how you prove the work came back exactly right.

AS9110C does not replace your regulatory approval, and it cannot be used in its place. Rather, it sits alongside it - the approval is your permission to work, while the standard is evidence of how well you actually run the organisation behind it.
Technical Risk Matrix

Where MRO audits actually find you.

Four areas account for most customer and regulatory findings in a live hangar environment - this is about the operation itself, not just the paperwork behind it.

DGCA CAR-145 alignment

CAR-145, issued by the Directorate General of Civil Aviation (DGCA), is the regulatory permission that allows you to release aircraft to service. AS9110C is the voluntary quality standard that your OEM, airline, and lessor customers judge you against instead. The two run on overlapping evidence, so rather than maintaining a maintenance organisation exposure sheet, quality manual, and audit schedule twice over, we build these once and map them to both. Gaps usually surface where CAR-145 compliance is assumed to satisfy AS9110C by default. It does not.

Shelf-life controls

Shelf-life-limited consumables and materials that are tracked only by spreadsheet in a live hangar tend to drift out of date faster than the spreadsheet itself gets updated. What the system actually needs is a positive control - expiry flagged at the time of receipt, blocked at the point of issue, and reconciled on a fixed cycle - rather than a register that someone checks only when they happen to remember.

Tool & equipment calibration tracking

Calibration recall for tooling and test equipment is one of the most common findings in MRO audits, simply because the tool that is overdue is still sitting in the toolbox, looking identical to the one that is current. Recall needs to be physically enforced at the point of use, rather than just logged in a register.

Clause 8.4 - external provider control

Subcontracted maintenance tasks need documented approval of the sub-tier provider, verification criteria agreed upon before the work goes out, and evidence retention that proves the work came back matching exactly what was authorised. Informally-approved subcontractors are, by far, the single most common Clause 8.4 finding across maintenance environments.

The Practice Behind Every Engagement

Recurring findings recur because the structure produces them.

Four systems-led disciplines are used to find and fix that structure - with AI-assisted analysis applied where it genuinely improves speed and discipline: mapping audit evidence, spotting process gaps, and structuring corrective-action follow-up.

Discipline 01

Systems Thinking

Understanding why your recurring findings keep recurring - and how to actually make them stop, by fixing the structure rather than blaming operators or tools.

Discipline 02

System Dynamics Modelling

How delays, feedback, and incentives drive quality behaviour over time - and where just one small change can move the whole system.

Discipline 03

Critical Thinking

We separate the certificate from the actual capability, and test every assumption an auditor will test - before they get the chance to.

Discipline 04

Design Thinking

We build the system around your people, culture, and behaviour, so that quality survives real production - rather than just audit day.

These are the disciplines Simon taught as lead faculty for Systems Thinking & System Dynamics at Boeing's Technical Leadership Institute.
How To Tell The Difference

How to assess the evidence behind an advisory approach.

Every AS9110C consultant will tell you that your hangar is close to ready. Before you sign anything with them, ask them to actually show you the evidence - rather than just tell you.

What You'll Hear

"Your CAR-145 approval basically covers AS9110C."

What To Check

It does not. CAR-145 is the regulatory permission that allows you to release aircraft to service, whereas AS9110C is a separate, voluntary standard that your airline, lessor, and OEM customers use to judge you, based on different evidence altogether. Ask them specifically which one you are being assessed against.

What You'll Hear

"We'll tighten up your technical records."

What To Check

Ask them how, exactly. Amendment status, retention, legibility, and traceability under audit are four separate failure points - a consultant who cannot name which one is your actual gap has not diagnosed anything yet.

What You'll Hear

"Calibration is under control."

What To Check

The most common finding in a Maintenance, Repair and Overhaul (MRO) audit is an overdue tool still sitting in the toolbox, looking exactly like a current one. "Under control" should mean physically enforced at the point of use, rather than just logged on paper - ask to actually see it enforced.

What You'll Hear

"We've done AS9100 work - MRO is basically the same."

What To Check

It is not the same. Human factors, technical records, and certifying-staff competence are maintenance-specific areas that a manufacturing-only consultant has simply never audited before. Ask them which hangars they have worked in, and what exactly they found there.

Fit Check

This is for you if…

01You are an MRO, repair station or component overhaul organisation - typically 30 to 500 people.
02You hold a regulatory maintenance approval and customers are now asking for AS9110C as well.
03You hold AS9100D but your work has shifted from manufacturing to maintenance.
04Airline, lessor or OEM audits are producing findings your regulatory audits do not.
05Technical records and certifying-staff competence evidence are your known weak points.
06You want a sequenced route to AS9110C - not a folder of templates.
If two or more of these apply to you, the gap is in your system evidence, rather than in your engineering.
Leadership

Who you'd actually be working with.

Simon Kuntam, Founder and Principal Advisor, Suriyavaan Solutions
Simon Kuntam
Founder & Principal Advisor

Former Country Quality Leader, Boeing India (AS9100D scope: 9 sites, 5,000+ engineers). IAQG/Probitas-authenticated AS9100D auditor.

Connect on LinkedIn

Exp / 01
25+ Years

Boeing · Schneider Electric · ABB · safety-critical field engineering

Office / 02
Boeing India

Former Country Quality Leader · AS9100D Management Representative

Scope / 03
9 Sites · 5,000+

AS9100D certification scope - one of the largest Boeing operations outside the continental US

Authority / 04
IAQG · Probitas

Authenticated AS9100D aerospace auditor

NPI / 05
AS9145 APQP & PPAP

Aerospace new product introduction - advanced product quality planning and production part approval

Software / 06
CMMI V3.0 Practitioner

Certified CMMI Practitioner (ISACA) on the current V3.0 model

Faculty / 07
Systems-Led Disciplines

Trainer in Systems Thinking, System Dynamics Modelling, Critical Thinking and Design Thinking

Suriyavaan is an independent advisory led by an auditor-practitioner - rather than a certification body or a template vendor. Full career history, all nine professional certifications and the complete standards list are available on the main practice page.
Engagement Model

Start small, prove value, then scale.

There is no year-long contract before we both actually know your real gaps.

Step 01

15-Min Readiness Diagnostic

Free · where you are, what blocks approval, and an honest read on fit.

Step 02

Flight Plan Workshop

Half or full-day on-site · gap snapshot and dated route map · fixed fee, quoted before booking.

Step 03

Certification Advisory Retainer

Alongside you through readiness, implementation and audit preparation · scoped after the workshop.

The Three Practices

One advisory, three aerospace quality standards.

Manufacturing, maintenance, and distribution are all audited against different standards, but by the same OEM supplier-quality teams. Please pick the one that actually matches what you do.

India-Specific Approvals

AS9110C is the system. These are the licences to work in India.

For a maintenance organisation in India, the certificate and the regulatory approval are two different tests run by two different bodies. The same operating system has to satisfy both, and keep doing so between surveillance visits.

Indian authorities and schemes that sit above, or alongside, AS91XX certification. Requirements change; confirm the current issue of each regulation before you plan against it.
AuthorityWhat it coversWho needs itWhere AS91XX fits
DGCA - CAR-145, CAR-M and CAR-147Civil maintenance. CAR-145 is the approval of maintenance organisations under Rule 133B of the Aircraft Rules 1937 (accountable manager, quality manager, certifying staff, facilities, procedures and release). CAR-M covers continuing airworthiness management; CAR-147 covers maintenance training organisations.MRO providers, component repair shops, CAMO functions and training organisations serving Indian operators and lessors.AS9110C and CAR-145 test the same things - competence and authorisation, human factors, tooling and calibration control, part traceability and release - but CAR-145 is the licence to work. Build one system that satisfies both and keep it running between audits.
DGAQA (Directorate General of Aeronautical Quality Assurance, Department of Defence Production, MoD)Government quality assurance and final acceptance of military aircraft, UAVs, aero-engines, airborne systems, avionics, armaments and consumables across design, production, repair, overhaul and life extension. DGAQA also approves firms and their quality management systems, and carries out capacity assessment and registration of firms and test laboratories.Any supplier whose product is accepted by a Government QA representative: direct MoD suppliers, DPSU sub-tiers, repair and overhaul shops on military stores, test laboratories.DGAQA registration is a capacity and QMS assessment followed by product acceptance on the floor. An AS9100D or AS9110C system gives the evidence structure; what DGAQA tests is whether the inspection, traceability and non-conformance records hold up at acceptance.
CEMILAC (Centre for Military Airworthiness and Certification, DRDO)Military airworthiness. Type certification and design evaluation of military aircraft, aero-engines, airborne stores, software and electronic hardware under the MoD document DDPMAS, delivered through its Regional Centres for Military Airworthiness (RCMAs). Type approval carries the authority to produce the item under RCMA supervision.Firms that design, develop, modify or produce airborne items for the Indian Air Force, Navy, Army aviation, DRDO programmes or the DPSUs.The RCMA samples a working configuration-control, traceability and qualification record. AS9100D, with DO-178C / DO-254 evidence for software and electronics, is what that record is usually built on, but the certificate alone is not the approval.
MoCA, DGCA and QCI - Drone Rules 2021Unmanned aircraft. A drone model needs a Type Certificate before it can be manufactured, imported or operated in India. The prototype is tested by a certification body approved by the Quality Council of India (currently TQ Cert, UL India and Bureau Veritas); DGCA issues the certificate. The rules allow 60 days for the certification body and 15 days for DGCA once the file is complete.Drone and UAS OEMs, and the parts, motors, batteries, airframe and software suppliers feeding them.The Type Certificate certifies the design. Repeatable production, configuration control and traceability are what keep an OEM's certificate valid and what its suppliers are audited for. AS9100D-style process ownership is the shortest route to that.
What Suriyavaan does not claim. Suriyavaan is not CEMILAC, DGAQA, DGCA, QCI or a DPSU, holds no delegated authority from any of them, and does not issue, expedite or influence their approvals. We prepare the operating evidence those bodies test, and we say so before you book.
FAQ

Questions we're asked first.

Is AS9110 different from AS9100, or an add-on to it?

AS9110C is a separate standard, built on the same ISO 9001 foundation, but with the manufacturing requirements replaced by maintenance-specific ones. If you overhaul, repair, or maintain aircraft or components, AS9110C is the correct standard for you - not AS9100D. Organisations that both manufacture and maintain sometimes hold both certifications, scoped to their different activities.

Do we need AS9110 if we already hold a national maintenance approval?

They actually do two different jobs. Your CAR-145 approval is the regulatory permission that allows you to release aircraft to service. AS9110C, on the other hand, is a voluntary quality-management standard that customers - airlines, lessors, OEMs, and defence buyers - use to judge how well you actually run the organisation behind that approval. Many MROs hold both, and since the evidence overlaps heavily, building one well also reduces the effort needed for the other.

We're already AS9100 certified. Can we move to AS9110?

Yes, and this is actually a common route for organisations whose work has shifted from build to maintenance. Much of your existing system carries over - the gap is usually concentrated in maintenance process control, technical records, human factors, and certifying-staff competence. The diagnostic identifies which of these are real gaps for you specifically, rather than simply assuming all four apply.

How long does AS9110C readiness take?

The route map gives you actual dates after the workshop, rather than a guess before it. As a rough anchor: a manufacturer moving from ISO 9001 to AS9100D typically plans for 6–9 months. An MRO adds maintenance-specific processes on top of that same foundation, so please plan for at least the same duration, and longer still if technical records and human-factors practice need to be rebuilt.

Do you issue the AS9110 certificate?

No - and this is deliberate. Suriyavaan is an independent advisory led by an auditor-practitioner, rather than a certification body. Building your system and then also auditing it would be a clear conflict of interest. We build the system that passes your certification body's audit, and most clients simply keep the certification body they already use.

What does this cost?

The diagnostic itself is free. The Flight Plan Workshop is a fixed fee, quoted before you book. Advisory retainers are scoped only after the workshop - so that you know your actual gaps, and the full cost, before committing to anything long-term. Engagements are sized for Micro, Small and Medium Enterprises (MSMEs), rather than for OEM-level budgets.

Book the Diagnostic

Ready to find out what's blocking approval?

Book a free 15-minute diagnostic with us. You will get an honest read on your readiness, the likely blockers, and the most practical next step forward - whether or not we end up working together.

Direct Channels
Phone / WhatsApp+91 97413 70111
LinkedInSimon Kuntam
LocationBangalore, India
On-site workshops across India

Your next step

Start with the problem you need to solve.

Bring your current scope, customer requirements and the issue holding progress back.

Book a free diagnostic ↗Email Simon →