suriyavaan Aerospace Quality · Systems Transformation
AS9110C · AS9120B · AS9100D · Middle East & GCC

Aviation MRO and aerospace supplier-quality advisory for the Middle East.

Your regulator's approval is permission to work. AS9110C is what the airline, the lessor and the OEM use to judge how well you run the organisation behind that approval — and it is judged on maintenance process control, technical records, competence evidence and sub-tier control, not on the quality manual. Suriyavaan builds the system that holds up when a customer audits the hangar.

Simon Kuntam — Founder & Principal Advisor

IAQG/Probitas-authenticated AS9100D Lead Auditor since 2020, and former Country Quality Leader, Boeing India. Full background and credentials.

9 Sites · 5,000+
Boeing India AS9100D Scope
IAQG · 2020
Certified AS9100D Lead Auditor
25+ Years
Field & Aerospace Audit Experience
Or call +91 97413 70111 · India-based · remote diagnostics · on-site workshops by arrangement

15-Min International Readiness Diagnostic

Free · remote · no pitch, no obligation
  • Where your quality system stands today, against the standard that actually applies to your scope
  • The most likely blockers to customer or OEM approval
  • Whether Suriyavaan is the right fit — an honest read, either way
  • A concrete next step, whether or not we work together
Who should join: the MD/CEO and your Quality Head, together.
Book Middle East MRO Quality Diagnostic Prefer WhatsApp? Message us — reply within one business day.
Direct answer

Suriyavaan supports aviation MROs, component repair organisations, distributors, defence-support suppliers, and aerospace manufacturers across selected Middle East and GCC markets with AS9110C, AS9120B, AS9100D readiness, customer-audit preparation, supplier and purchasing control, competence systems, audit recovery, and quality-system strengthening. Engagements are delivered remotely, with on-site workshops by arrangement.

Suriyavaan is India-based. No GCC office is implied. Suriyavaan does not act as a certification body, and does not advise on national civil aviation regulatory approvals in any GCC state.

AS9110CAS9120BAS9100DClause 8.4ICAO Annex 19
What Suriyavaan Supports

What Suriyavaan can support for Middle East / GCC aerospace organisations.

Scope is stated plainly, so you can tell what is inside the practice and what is not.

AS9110C maintenance process control

Work orders, task cards and the release chain: evidence that the maintenance actually performed matches what was authorised, and that the record proves it. This is the first place a customer audit goes.

Technical records and maintenance data

Amendment status, retention, legibility and retrieval speed under audit. The work being correct is not the same as the record proving it was — and only one of those survives an audit.

Certifying staff competence and authorisation scope

Qualification, authorisation scope and continuation training for the people who sign the release, evidenced as competence rather than attendance.

Tooling, calibration and shelf-life control

The overdue tool sitting in the toolbox looking identical to a current one is the most common MRO finding there is. Recall has to be enforced at the point of use, not logged in a register.

AS9120B distributor and stockist controls

For the distribution side of the region's supply base: traceability to source, certificate of conformity control, counterfeit-parts risk, and records that survive an airline or OEM audit.

Supplier and purchasing control under clause 8.4

Subcontracted maintenance and purchased material: documented approval basis, verification criteria agreed before work goes out, and retained evidence that it came back matching what was authorised.

Customer-audit recovery

Where an airline, lessor, OEM or defence customer has already raised findings — root-cause clarity, containment, systemic action, and effectiveness verification that stops the finding reopening.

Coverage & Delivery

Markets, standards and delivery model.

Coverage is by arrangement and delivered remotely from India. Listing a country does not imply a local office, local legal or regulatory expertise, or a local certification-body relationship.
MarketStandards supportedBuyer typesDelivery
United Arab EmiratesAS9110C, AS9120B, AS9100DAviation MROs, component repair organisations, distributors, defence-support suppliers, aerospace manufacturersRemote diagnostic; on-site workshop by arrangement
Saudi ArabiaAS9110C, AS9120B, AS9100DAviation MROs, component repair organisations, distributors, defence-support suppliers, aerospace manufacturersRemote diagnostic; on-site workshop by arrangement
QatarAS9110C, AS9120B, AS9100DAviation MROs, component repair organisations, distributors, defence-support suppliers, aerospace manufacturersRemote diagnostic; on-site workshop by arrangement
OmanAS9110C, AS9120B, AS9100DAviation MROs, component repair organisations, distributors, defence-support suppliers, aerospace manufacturersRemote diagnostic; on-site workshop by arrangement
BahrainAS9110C, AS9120B, AS9100DAviation MROs, component repair organisations, distributors, defence-support suppliers, aerospace manufacturersRemote diagnostic; on-site workshop by arrangement
KuwaitAS9110C, AS9120B, AS9100DAviation MROs, component repair organisations, distributors, defence-support suppliers, aerospace manufacturersRemote diagnostic; on-site workshop by arrangement
Problems We Fix

What usually goes wrong.

These are the patterns that bring Middle East / GCC organisations to an advisory rather than to a certification body.

Customer Audit Risk

The regulator is satisfied; the customer is not

Regulatory approval is current, but airline, lessor and OEM audits keep producing findings. That gap is almost always records, sub-tier control or competence evidence — not the maintenance itself.

Records Risk

Technical records that don't survive scrutiny

The work was done correctly, but retrieval is slow, amendment status is unclear, or the record cannot answer the question the auditor is actually asking.

Competence Risk

Certifying-staff authorisations drift

Authorisation scope, continuation training and competence evidence fall out of step with who is actually signing releases week to week.

Supply Chain Risk

Subcontracted work you cannot fully evidence

Maintenance sent outside was approved informally, or the returning evidence does not match what clause 8.4 expects you to hold.

Distribution Risk

AS9120 traceability gaps

Certificates of conformity, source traceability and counterfeit-parts controls that were adequate for general trade but are not adequate for aviation supply.

Standard Fit Risk

Certified to the wrong standard

An organisation whose work has shifted from build to maintenance still holding AS9100D, where AS9110C is the standard customers are actually assessing against.

The Method

Systems transformation, not template consulting.

Five steps. Each one produces something you keep, and each one is designed around what a customer or registrar will actually test.

Step 01

Diagnostic

Remote. Where the system actually stands, the most likely blockers to approval, and an honest read on fit — before anyone commits to anything.

Step 02

Gap Map

Each requirement assessed against evidence that exists, evidence that is claimed, and evidence that is missing. Gaps ranked by what blocks approval first.

Step 03

30 / 60 / 90-Day Roadmap

A dated plan with named process owners. What must be true at day 30, day 60 and day 90 — not a task list handed to the quality manager.

Step 04

Process Owner Deployment

Each process owner able to explain their process, its measures, its risks and its recent corrective actions without the quality function answering for them.

Step 05

Mock Audit & Sustainment

The system tested the way a customer or registrar will test it, then the handover that keeps it working after the engagement ends.

International Engagement Model

How an international engagement is structured.

Remote diagnostics across IST, GST, TRT, JST, ICT and SGT time zones. Best used before a customer audit, certification transfer, certificate recovery, or OEM supplier onboarding — not after.

Every stage is remote unless stated. On-site workshops are arranged separately and quoted before booking.
StageOfferFormatBest for
Stage 015-min International Readiness DiagnosticRemoteInitial fit check — an honest read on whether this is the right engagement, either way
Stage 12-hour AS91XX / OEM Gap ReviewRemoteSerious buyers with known gaps who want them named and prioritised
Stage 2International Flight Plan WorkshopRemote or on-siteLeadership alignment and a dated route map with named process owners
Stage 390-Day Readiness SprintHybridPreparation for a specific customer audit, certification event or approval decision
Stage 46–9 Month Advisory RetainerHybridFull quality-system transformation through readiness, implementation and sustainment
We can work under NDA before reviewing audit reports, customer findings, supplier lists, engineering data, or OEM correspondence. Ask for it at the diagnostic stage rather than after.
What Suriyavaan does not claim. Suriyavaan provides advisory and readiness support. Certification decisions are made by accredited certification bodies. Customer and OEM approvals are made by the relevant customer or OEM. No certification guarantee, OEM approval guarantee, or OEM endorsement is implied.
Frequently Asked

Middle East / GCC readiness — common questions.

Does Suriyavaan support AS9110 readiness for Middle East MRO organisations?

Yes. Suriyavaan supports MRO and aviation service organisations with AS9110C readiness, process-owner preparation, audit evidence, technical records control, supplier and purchasing control, competence systems, and customer-audit readiness.

Does Suriyavaan work with UAE, Saudi, Qatar, Oman, Bahrain, and Kuwait organisations?

Suriyavaan is India-based and supports selected Middle East and GCC organisations remotely, with on-site workshops by arrangement. No GCC office is implied. Working hours overlap comfortably: IST is 1.5 hours ahead of GST.

Does Suriyavaan guarantee AS9110 certification or customer approval?

No. Suriyavaan provides readiness and advisory support. Certification and customer approval decisions are made by the relevant certification body, customer, or OEM.

Is AS9110 different from AS9100, or an add-on to it?

AS9110C is a separate standard on the same ISO 9001 foundation, with the manufacturing requirements replaced by maintenance ones. If you overhaul, repair or maintain aircraft or components, AS9110C is the correct standard. Organisations that both manufacture and maintain sometimes hold both, scoped to different activities.

Do you advise on GCC national aviation regulations?

No. Suriyavaan does not claim GCAA, GACA or any other national civil aviation authority regulatory expertise, and does not advise on national approvals. Our scope is the quality management system your customers assess — which sits alongside your regulatory approval, not in place of it.

What is the best first step for a GCC MRO or distributor?

An MRO Quality System Diagnostic, or an AS9120B readiness review for a distributor. It is a remote conversation that identifies where the real gaps are before anyone commits to a programme — and gives an honest read on whether Suriyavaan is the right fit.

Book the Diagnostic

Ready to find out what is blocking approval?

Book a free 15-minute remote diagnostic. You will get an honest read on your readiness, the likely blockers, and the most practical next step — whether or not we work together.

Remote diagnostic · NDA available before document review · no certification or OEM approval guarantee · on-site workshops by arrangement.
Direct Channels
Phone / WhatsApp+91 97413 70111
LinkedInSimon Kuntam
BaseBangalore, India
International engagements remote and by arrangement
Time zonesIST · GST · TRT · JST · ICT · SGT
Call WhatsApp Email Book